Loading VALADIR
Input · Live now

Typist Split

A split board on open firmware, tuned by hand. Six macro layers built to cut repetitive strain, with one-key prompts to your AI assistant, Docker commands and terminal switching. Change any key yourself in minutes.

  • OPEN FIRMWARE
  • HARDWARE MOD
7 of 20 left
Ships in 5–7 days · 9 bench hours
Stock vs VALADIR

Out of the box, and off our bench.

StockVALADIR VLD-101
FirmwareVendor configurator, preset layoutsQMK or ZMK built for you, fully remappable
SwitchesFactory dryHand-lubed with Krytox 205g0, one by one
LayersOne default layerSix: code, AI prompts, Docker, terminal, media, rest
ErgonomicsFlat, stock wrist padsTented, custom-cut wrist rests
The build

What we start with, and what you get.

01 · Sourced hardwareZSA Moonlander / Glove80Sourced new or lightly used ergonomic split boards, switches tested one by one.
02 · The VALADIR modQMK / ZMK firmware, Hand-lubed switches, RSI macro layersEvery switch opened and hand-lubed, stabilizers tuned, and the board flashed with open-source QMK or ZMK firmware and our own layer map.
03 · The valueA split board on open firmware, tuned by hand.Six macro layers built to cut repetitive strain, with one-key prompts to your AI assistant, Docker commands and terminal switching. Change any key yourself in minutes.
Spec sheet

VLD-101, line by line.

Layout
Split, column-staggered, 72–80 keys
Switches
Hand-lubed linear or tactile, your pick
Firmware
QMK (Moonlander) or ZMK (Glove80), fully remappable
Macro layers
6, including AI prompts, Docker and terminal
Connection
USB-C; TRRS (Moonlander) or Bluetooth (Glove80)
Wrist rests
Custom-cut, included
Drop
DROP 01 · The Workspace
Lead time
Ships in 5–7 days
Warranty
The original manufacturer may refuse warranty work on a modded unit. VALADIR bench support covers what we changed for 12 months.

In the box

  • 01Two keyboard halves
  • 02Braided USB-C cables (plus TRRS for Moonlander)
  • 03Custom wrist rests
  • 04Printed layer map
  • 05Provenance report and mod log
Bench log

9 hours on the bench.

What happens to every unit, step by step, with roughly how the hands-on hours split. The 72-hour burn-in runs unattended on top of this.

  1. SourceBoard inspected, every switch tested~1hOK
  2. UnlockStock layout backed up, board put in bootloader mode~2hOK
  3. ModSwitches opened, lubed and closed, stabilizers tuned~3.5hOK
  4. TestFirmware flashed, every key and layer tested~2hOK
  5. PackLayer map printed, mod log written, sealed~0.5hOK
  6. Burn-in72 hours unattended, then sealed and shipped72hPASS

Build queue

0 builds in your queue

Your queue is empty. Add a build from the catalog and send it to the bench when you’re ready.

Browse the catalog